YOUR CLOSE TO HOME TRAFFIC FIND YOUR LOCATION HERE
TDOT Lane Closure Report for Middle Tennessee, Sept. 29 – Oct. 5, 2022
DAVIDSON COUNTY I-24
The grading, drainage, construction of a retaining wall, signal traffic we alsos and paving on I-24 at the EB exit ramp to SR 254 (Bell Rd., Exit 59)(LM 23.25 – LM 24.30)
· Nightly, 8 p.m. – 5 a.m., Excluding Saturday, There will be lane closures on I-24 EB and Bell Road, for construction activities.
· LOOK AHEAD: 9/30 – 10/3 Continuous Closure, There will be double lane closures on I-24, in both directions, for median wall demolition and concrete pouring activities. Once the demo is complete, one of the WB lanes will re-open. The EB lanes will remain closed for the duration of the weekend.
DAVIDSON / RUTHERFORD COUNTY, I-24
The construction of an Intelligent Transportation System and upgrades from Nashville to Murfreesboro (Phase 2)
· Nightly, 8 p.m. – 5 a.m., There will a be alternating lane closures and rolling road blocks to install overhead sign gantries from MM 60 to 70.
RUTHERFORD COUNTY, I-24
The resurfacing on I-24 from near Baker Road to east of Medical Center Pkwy. MM 70 – 80
· Nightly, 8 p.m. – 5 a.m., There will be alternating lane closures EB and WB for degrassing and milling shoulders.
DAVIDSON COUNTY I-40
The resurfacing on I-40 from near U.S. 70 (S.R. 24) (L.M. 9.61) to near 46th Avenue (L.M. 13.33).
· Nightly, 8p.m. – 5 a.m., There will be alternating lane closures in both directions on I-40 from Charlotte Pk to 46th Ave for milling and paving.
The grading,drainage, signals, and paving on I-40 at the U.S. 70 (S.R. 24, Charlotte Pike) WB exit ramp (L.M. 9.65)
· Nightly, 8 p.m. – 5 a.m., The off ramp from I-40W to U.S. 70 (S.R. 24, Charlotte Pike) will be closed to restripe and pave.
The grading, drainage, construction of bridges, retaining walls and paving on I-40 (MM 216) at the Donelson Pike interchange
· Nightly, 8 p.m. – 4 a.m., There will be a double lane closure for traffic control for setting barrier wall. Two lanes will remain open in each direction.
DICKSON / WILLIAMSON I-40
The resurfacing of I-40 from I-840 (LM 13.5 in Dickson County to the Cheatham County Line (LM 3.11) in Williamson County (MM 176 – 184)
· Eastbound 7 p.m. – 5 a.m. & Westbound 8 p.m. – 6 a.m., There will be a lane closures in both the EB and WB directions for milling and paving operations on I-40 from MM 176.5 to MM 184.3.
DICKSON / WILLIAMSON / CHEATHAM / DAVIDSON COUNTIES
The expansion of the Smartway Intelligent Transportation System (ITS) on I-40 from near I-840 in Dickson County to near U.S. 70S (Exit 196) in Davidson County
· Daily, 7:30 a.m. – 6 p.m., There will be temporary daytime shoulder closure for the drilling of the foundations for CCTV cameras at various locations throughout the project limits.
WILSON COUNTY I-40
The resurfacing on I-40 from South Hartman to the Smith County Line
· Nightly, 8 p.m. – 5 a.m., There will be alternating lane closures on I-40 EB and WB from S. Hartman to Smith Co. Line for the resurfacing of I-40
SMITH COUNTY I-40
The resurfacing on I-40 from the Smith County to the Gordonsville exit
· Nightly, 8 p.m. – 5 a.m., There will be alternating lane closure on I-40 EB from Smith County Line to Gordonsville for the resurfacing of I-40
DAVIDSON COUNTY I-65
The on-call concrete pavement repair at various locations on various Interstate and State Routes
· Nightly, 8 p.m. – 5 a.m., There will be full and partial ramp closures on I-65 SB at Armory Drive and on Armory Drive to I-65 SB on ramp, to saw damaged concrete.
The installation of an overhead sign structure on I-65
· Daily, 9 a.m. – 3 p.m., There will be shoulder closures on I-65 SB for overhead sign footing installation.
DAVIDSON COUNTY, I-65 & SR 245
The grading, drainage, construction of a retaining wall, signals and paving on I-65 at the NB exit ramp to SR 254 (OHB, Exit 74A)
· Daily, 9 a.m. – 3 p.m. There will be temporary lane closures on SR 254(OHB) in both directions for grading and signal work. Two lanes willl remain open in each direction.
MARSAHLL COUNTY, I-65
The resurfacing on I-65 from North of US 31A (SR 11) (LM 0.38) to the Maury County line MM 22-35
· Nightly, 7 p.m. – 6 a.m., There will be night time lane closures both NB and SB for paving operations. One lane to remain open at all times.
ROBERTSON COUNTY I-65
Grading, drainage, construction of bridges and retaining walls, ITS and paving
· Nightly, 8 p.m. – 4 a.m., Setting Beams at Bridge 5 Nights of Sunday 9/25 through Thursday 9/29 (Cedar Grove Road MM 114.6). Rolling Roadblocks will be utilized when swinging the beams. There will be night time lane closures both NB and SB for barrier rail installation, ingress/egress construction, and Traffic/Pavement Maintenance. One lane to remain open at all times.
MAURY COUNTY, I-65
Resurfacing of I-65 from the Marshall County Line to near SR-99
· Nightly, 8 p.m. – 5 a.m., There will be temporary lane closures on I-65 North and South bound lanes for milling and paving operations. One lane will remain open at all times. (MM 35 – 45)
The retracing of pavement markings with spray thermoplastic on various interstates and state routes in Region 3. (MM 46.3 – 52.9)
· Nightly, 8 p.m. – 6 a.m., There will be lane closures for mobile long line striping operations in both the Westbound and Eastbound direction of I-24 in Montgomery County.
Grading, drainage, bridge and paving on I-65 and SR 99
· 9/29 – 9/30, 8 p.m. – 5 a.m., There will be temporary lane closures on I-65 SB lanes to set barrier rail. One lane will remain open at all times.
SUMNER COUNTY I-65
The resurfacing on I-65 from the Millersville Exit to Bethel Road exit
· Nightly, 8 P.M. – 5 A.M, There will be alternating lane closures on I-65 NB and SB from exit 98 to exit 104 for the resurfacing of I-65.
WILLIAMSON COUNTY I-840,
The resurfacing on I-840 from near MM 8 to east of Liepers Creek Rd overpass. Including removal of pavement at bridge ends and expansion joint repair. MM 18.6 – 29.1
· Daily, 6 a.m. – 6 p.m., There will be temporary lane closures on I-840 in both directions for bridge joint repair. One lane will remain open at all times.
DAVIDSON COUNTY SR 6
The resurfacing on U.S. 31E (S.R. 6) from north of S.R. 45 (Old Hickory Boulevard) (L.M. 18.60) to the Sumner County line (L.M. 22.87)
· Nightly, 8 p.m .– 5 a.m., There will be a lane closure for milling and guardrail installation.
DAVIDSON COUNTY SR 24
The grading,drainage, signals, and paving on I-40 at the U.S. 70 (S.R. 24, Charlotte Pike) WB exit ramp (L.M. 9.65)
· Daily, 9 a.m – 3 p.m., There will be a lane closure on Charlotte Pike for concrete island removal and replacement.
Sanitary/ Storm Sewer location work
· 10/1 – 10/2, 6 a.m. – 4 p.m., There will be intermittent lane closures on SR-24 EB and WB for survey work. Two lanes of traffic will remain open as we temporarily block one lane. Traffic control will be provided by Superior Traffic Control.
DAVIDSON COUNTY SR 1
The repair of the bridge on U.S. 70S (S.R. 1, Harding Pike) over Sugartree Creek (L.M. 12.95)
· 10/3 – 10/5, 9 A.M. – 3 P.M., There will be a right lane closure on SR 1 WB for gas line removal.
DAVIDSON COUNTY SR 65
The resurfacing on U.S. 431 (S.R. 65) from South of Gifford Place to the Robertson County line, including concrete overlayed bridge deck repair and thin epoxy overlay
· 10/5 9 A.M., 3 P.M., There will be lane closures in various locations for Bridge deck and epoxy.
DAVIDSON COUNTY SR 106
The resurfacing on SR 106 from near SR254 (OHB) to near Harding Pike
· Daily, 9 a.m. – 3 :30 p.m., There will be multiple, alternating lane closures for paving and striping operations.
DAVIDSON COUNTY, SR 112
SR 112 (US 41A/Clarksville Pike) from SR 12 (Ashland City Highway) to SR 155 (Briley Pkwy.) – Piedmont Move Prior
· Daily, 9 a.m. – 3 p.m. There will be a temporary alternating lane closure on SR 112 Clarksville Pike in both directions for grade work, storm drainage, sanitary sewer and overhead power. Flaggers will be utilized.
DAVIDSON COUNTY SR 155
The on-call concrete pavement repair at various locations on various Interstate and State Routes
· 10/3 – 10/5, 8 p.m. – 5 a.m., There will be a full ramp closure on Brick Church Pike NB to Briley Parkway WB to repair damaged concrete.
The resurfacing on S.R. 155 (Briley Pkwy) from the McGavock Pike ramp to the bridge over I-65 including S.R. 6 from Ellington Pkwy (L.M.15.49) to Gallatin Pike (L.M. 16.49)
· Nightly, 8 p.m. – 5 a.m., There will be temporary lane closures, in both directions on Briley Parkway (S.R. 155) for final striping. Temporary ramp closures may be needed also.
The intersection improvements on S.R. 155 (Briley Parkway) at the Brick Church Pike ramps
· Daily, 9 a.m. – 3 p.m. There will be a lane closure daily on Brick Church Pk for signal work and guardrail installation.
MACON COUNTY SR 10
Resurfacing SR-10 from Public Square to Ellington Drive
· Daily, 9 a.m. – 3:30 p.m., SR 10 will have intermittent lane closures for final pavement markings
MACON COUNTY SR 52
Resurfacing SR 52 from Whitaker Lane to White Lane
· Daily, 9 a.m. – 3:30 p.m., SR 52 will have intermittent lane closures for final pavement markings
MONTGOMERY COUNTY SR 13
Consisting of: the grading, drainage, construction of welded steel plate girder bridge, retaining wall and paving on S.R. 149 and S.R. 13 from River Road to Zinc Plant Road. MM 17-19
· Daily, 7 a.m. – 5 p.m., There will be periodic single-lane traffic flow and flagging operations along SR-13 on Wednesday (09/14) from 9AM to 3PM, therefore delays are expected. Mayhew Road will remain closed. Traffic on SR-13 will remain in the phase 4 alignment as switched on 11/7/20. Traffic on SR-149 will be in the planned phase 4 alignment. Width reduced to 22′ for entire project.
MONTGOMERY COUNTY US 41A / SR 12
Bicycles and Pedestrian Facilities
· Daily, 9 a.m. – 3 p.m., Sidewalk construction. Contractor to utilize 1 lane of traffic for safety and construction. Day and night time lane closures are possible.
· Nightly, 6 p.m. – 6 a.m., Sidewalk construction. Contractor to utilize 1 lane of traffic for safety and construction. Day and night time lane closures are possible.
MONTGOMERY COUNTY 236
The resurfacing of SR-236 from U.S. 41A (SR-12) (LM 0.00) to SR-48 (Trenton Road) (LM 6.82), including joint repair and thin epoxy overlay.
· Daily, 8 a.m. –3:30 p.m., There will be lane closures both EB and WB for paving operations. One lane to remain open at all times.
RUTHERFORD COUNTY SR 1
LPLM: Town of Smyrna Street Scapes on SR-1
· Daily, 9 a.m. – 3 p.m., There will be alternating lane closures for construction activities.
RUTHERFORD COUNTY SR 99
The grading, drainage, construction of retaining walls, signals and paving on SR-99 (New Salem Hwy) from near I-24 to SR-96 (Old Fort Pkwy)
· Daily, 9 a.m. – 3 p.m., There will be periodic flagging operations for construction activities.
RUTHERFORD COUNTY 266
The grading, drainage, construction of two concrete bulb tee beam bridges, signals, and paving on SR-266 (Jefferson Pike) from SR-102 (LM 5.0) to E. of I-840 (LM 9).
· Daily, 9 a.m. – 3 p.m., There will be periodic flagging operations for construction activities. Gils Street will be closed for installation of water main.
WILSON COUNTY SR 266
Resurfacing SR 266 from Moriah Drive to E. Main Street
· Daily, 9 a.m. – 3:30 p.m., There will be intermittent lane closures on SR 266 for final pavement markings
SUMNER COUNTY SR 174
Intersection improvements at SR 174 and Upper Station Camp Creek Road
· Daily, 8:30 a.m. – 2:30 p.m., There will be intermittent lane closures on SR 174 for paving and final pavement markings.
WILLIAMSON COUNTY SR 6
Grading, drainage and paving work on SR 6 (Franklin Road) from south of Moore’s Lane (LM 15.93) to Concord Road (18.53) – (mm 15.93 – 18.53)
· Daily 9 a.m. – 3 p.m., We anticipate needing intermittent stoppages of traffic, and/or temporary lane closures (one direction at a time) between the hours of 9AM and 3PM Monday thru Friday, and possibly on Saturday (although not currently scheduled) for various construction activity including paving and utility work throughout the project.
We are planning on having extended delays and possible lane closures for construction activities for the following side roads: Ashby, Drive, Holly Tree Gap Rd, Long St, West Concord, Wikle Rd and Mt. View Rd.
WILLIAMSON COUNTY SR 96
Grading, drainage, construction of bridges and signals on SR 96 from east of Arno Rd (LM 14.72) to SR 252 (Wilson Pk) (LM 20.62).
· Daily, 9 a.m. – 3 p.m., There will be lane closures and brief stoppages of traffic for utility relocations and grading work.
The resurfacing on SR-96 from near Boyd Mill Ave (L.M. 7.86) to Edward Curd Ln (L.M. 13.29).
· Nightly, 8 p.m. – 5 a.m., (Excluding Friday and Saturday) There will be a lane closure between Main St and I-65 for milling and paving operations.
· Nightly, 6 p.m. – 6 a.m., (Excluding Friday and Saturday) There will be a lane closure between Boyd Mill Ave and Hillsboro Rd (SR-106/US-431) for milling and paving operations.
WILLIAMSON COUNTY SR 100
The resurfacing of SR100 from Deer Ridge Rd (LM 3.00) to Fernvale Rd. (LM 6.85).
· 10/3 – 10/5, 8 a.m. – 2:30 p.m., There will be a lane closure for degrassing and milling.
>> MAINTENANCE & UTILITIES
DAVIDSON COUNTY I-40
Milling and Paving Eastbound lane #2
· 9/29, 8 p.m. – 5 a.m., Closing the spilt to I-40 E at I-65 on the inner loop. Lanes 1 and 2 will be closed (mm 209 – 210)
RUTHERFORD COUNTY I-24
Chemical Control of Vegetation (Herbicide Application)
9/29 – 9/30, 7 p.m. – 6 a.m., There will be a mobile operation EB and WB to apply herbicide to the right lane outside guardrails from MM 63.19 to MM 96.48 both directions on I-24 in Murfreesboro.
ROBERTSON COUNTY, I-65
Cutting and trimming vegetation off of Roadway Signs
· 10/1, 7 p.m. – 5 a.m., Lane closures for Cutting and trimming vegitation off of Roadway Signs
ROBERTSON COUNTY, I-65
Milling and Paving
· 10/4, 7 p.m. – 5 a.m., Lane closures for milling and paving operations in NB lane 2 at the 104.8 mm and NB lane 2 at the 105.4 mm
INTERSTATE PAVEMENT TESTING:
· I-40 Hickman County MM148 – 149 10/2 – 10/3, 8 p.m. – 6 a.m.
· I-65 Giles County MM 0 – 22 – 10/4 – 10/5, 8 p.m. – 6 a.m.
· I-65 Robertson County MM 103 – 111 – 9/29, 8 p.m. – 6 a.m.
· I-40 Humphreys County MM 134.8 – 148.10 – 10/2 – 10/3, 8 p.m. – 6 a.m.
I enjoyed reading this article. Its well-written and thought-provoking. Lets chat more about this topic. Check out my profile!
I love the efforts you have put in this, thank you for all the great blog posts.
I like looking at and I believe this website got some really utilitarian stuff on it! .
Pretty! This was a really wonderful post. Thank you for your provided information.