Road Construction and Lane Closures 5-1-5-2023

2
345

MIDDLE TENNESSEE SCHEDULED LANE CLOSURES

FOR YOUR CLOSE TO HOME TRAFFIC FIND YOUR LOCATION HERE

April 27 – May 5, 2023

To subscribe to the TDOT-REGION-3-LANE-CLOSURES list, send an email to [email protected]
and type subscribe TDOT-REGION-3-LANE-CLOSURES in the message body.
To unsubscribe from the TDOT-REGION-3-LANE-CLOSURES list, send an email to [email protected]
and type unsubscribe TDOT-REGION-3-LANE-CLOSURES in the message body.

DAVIDSON COUNTY I-24
The retracing of pavement markings with spray thermoplastic on various Interstate and State
Routes
 Nightly, 8 p.m. – 5 a.m., There will be temporary mobile lane closures on I-24 in the EB and WB
directions for restripe operations. There will be two striping crews so work may be done on
multiple routes: MM 40-46, 48-49, 52-53, 57-63.
The removing & replacing of snow-plowable pavement marker lenses on various State Routes
 Nightly, 8 p.m. – 5 a.m., Alternating north & south bound lane closures for replacing pavement
marker lenses. One lane will remain open at all times (MM 48 – 50 and 32 – 40)
MONTGOMERY COUNTY I-24
The removing & replacing of snow plowable pavement marker lenses on various State Routes
 Nightly, 8 p.m. – 5 a.m., Alternating NB & SB lane closures for replacing pavement marker lenses.
One lane will remain open at all times
ROBERTSON COUNTY I-24
Construction and Bridge repair
 Continuous, the outside shoulder will be closed in both directions with barrier rail at 4 different
overpassing bridges for bridge repair: SR-49, Jack Teasley Road, Gause Road, SR-256. Both lanes of
travel on I-24 will remain open.
RUTHERFORD COUNTY I-24
the removing & replacing of snow-plowable pavement marker lenses on various State Routes
 Nightly, 8 p.m. – 5 a.m., Alternating EB & WB lane closures for replacing pavement marker lenses.
One lane will remain open at all times.
DAVIDSON COUNTY I-40
The retracing of pavement markings with spray thermoplastic on various Interstate and State
Routes
 Nightly, 8 p.m. – 5 a.m., There will be temporary mobile lane closures on I-40 in the EB and WB

TDOT Region 3 • 6601 Centennial Boulevard • Nashville, Tennessee 37243
Tel: 615-741-7446 • Cell: 615-961-6717 • Email: [email protected]
directions for restripe operations. There will be two striping crews so work may be done on
multiple routes.

The removing & replacing of snow-plowable pavement marker lenses on various State Routes
 Nightly, 8 p.m. – 5 a.m., Alternating EB & WB lane closures for replacing pavement marker
lenses. One lane will remain open at all times.

DICKSON COUNTY I-40
The removing & replacing of snow-plowable pavement marker lenses on various State Routes
 Nightly, 8 p.m. – 5 a.m., Alternating NB & SB lane closures for replacing pavement marker lenses.
One lane will remain open at all times (mm 163 – 168)
HUMPHREYS / HICKMAN COUNTY I-40
The resurfacing of I-40 in Humphreys and Hickman County from MM 134.75 to MM 149.5
 Nightly, 8 p.m. – 5 a.m., There will be temporary nighttime lane closures in both the EB and WB
directions for milling and paving operations.
DICKSON / WILLIAMSON / CHEATHAM / DAVIDSON COUNTIES I-40
The expansion of the SmartWay Intelligent Transportation System (ITS) on I-40 from near I-840 in
Dickson County to near U.S. 70S (Exit 196) in Davidson County
 Daily, 7:30 a.m. – 6 p.m., There will be temporary daytime shoulder closure in both directions for
trenching and boring operations at various locations throughout the project limits.
HICKMAN / HUMPHREYS COUNTY
The resurfacing of I-40 in Humphreys and Hickman County from MM 134.75 to MM 149.5
 Nightly, 8 p.m. – 5 a.m., There will be temporary nighttime lane closures in both the EB and WB
directions for milling and paving operations.
HICKMAN COUNTY I-40
The removing & replacing of snow-plowable pavement marker lenses on various State Routes
 Nightly, 8 p.m. – 5 a.m., Alternating NB & SB lane closures for replacing pavement marker lenses.
One lane will remain open at all times (MM 149 – 152 & 160-163)
SMITH COUNTY I-40
The removing & replacing of snow-plowable pavement marker lenses on various State Routes
 Nightly, 8 p.m. – 5 a.m., Alternating NB & SB lane closures for replacing pavement marker lenses.
One lane will remain open at all times (MM 258 – 263)
WILSON COUNTY I-40
The removing & replacing of snow-plowable pavement marker lenses on various State Routes
 Nightly, 8 p.m. – 5 a.m., Alternating NB & SB lane closures for replacing pavement marker lenses.
One lane will remain open at all times (MM222-225 & 226 – 234)
The resurfacing on I-40 from the Smith County to the Gordonsville exit
 Nightly, 8 p.m. – 5 a.m., There will be alternating lane closures on I-40 EB and WB from the Sparta
Pike exit to Smith Co. Line For resurfacing activities on I-40
DAVIDSON COUNTY I-65

TDOT Region 3 • 6601 Centennial Boulevard • Nashville, Tennessee 37243
Tel: 615-741-7446 • Cell: 615-961-6717 • Email: [email protected]
The life cycle replacement of Dynamic Message Signs (DMS) on various Interstate routes.
 4/27, 8 p.m. – 11:15 p.m., There will be a triple right lane closure and rolling roadblocks on I-65
northbound to replace a DMS near Harding Pl. (MM 75 – 79)
 4/27, 11:45 p.m. – 3 a.m., There will be a double right lane closure and rolling roadblocks on I-65
NB to replace a DMS near Wedgewood Ave.
The removing & replacing of snow-plowable pavement marker lenses on various State Routes
 Nightly, 8 p.m. – 5 a.m., Alternating NB & SB lane closures for replacing pavement marker lenses.
One lane will remain open at all times. MM 84 – 86
The retracing of pavement markings with spray thermoplastic on various Interstate and State
Routes
 Nightly, 8 p.m. – 6 a.m., There will be temporary mobile lane closures on I-65 in the NB and SB
directions for restripe operations. There will be two striping crews so work may be done on
multiple routes. (MM 74-78, 85-86, 87-98)
GILES COUNTY I-65
The resurfacing on I-65 from the Alabama state line to south of U.S. 64 (S.R. 15) including thin epoxy
overlay on the bridge over S.R. 273
 Nightly, 6 p.m. – 6 a.m., Alternating NB & SB lane closures for milling and paving. One lane will
remain open at all times. MM 0 – 13
DAVIDSON COUNTY I-65 / SR 254
The grading, drainage, construction of a retaining wall, signals and paving on I-65 at the NB exit
ramp to SR 254 (OHB, Exit 74A)
 Daily, 9 a.m. – 3 p.m. There will be temporary lane closures on SR 254 (OHB) in both directions for
grading and signal work. Two lanes will remain open in each direction.
MAURY COUNTY I-65
Resurfacing of I-65 from the Marshall County Line to near SR-99
 Nightly, 8 p.m. – 5 a.m., There will be temporary lane closures on I-65 NB & SB lanes for painting
operations to restripe roadway. One lane will remain open at all times.
ROBERTSON COUNTY I-65
Interstate Widening – Grading, drainage, construction of bridges and retaining walls, ITS and paving
 Nightly, 8 p.m. – 5 a.m. There will be temporary lane closures on I-65 NB and SB for roadway
maintenance, one lane will always remain open.
Installation of Overhead Sign Structure
 continuous There will be continuous inside shoulder closures NB and SB with barrier rail. Daytime
closure for the NB outside shoulder. All lanes will remain open.
WILLIAMSON COUNTY I-65
The removing & replacing of snow-plowable pavement marker lenses on various State Routes
 Nightly, 8 p.m. – 5 a.m., Alternating NB & SB lane closures for replacing pavement marker lenses.
One lane will remain open at all times (MM 54-74)
I-65 Interchange at Buckner Road
 5/1& 5/3, 9 p.m. – 6 a.m. There will be rolling roadblocks on I-65 NB and SB from MM 55.40 to MM
56.00 for beam setting. Four (4) Troopers will be utilized.

TDOT Region 3 • 6601 Centennial Boulevard • Nashville, Tennessee 37243
Tel: 615-741-7446 • Cell: 615-961-6717 • Email: [email protected]
RUTHERFORD COUNTY I-840
The removing & replacing of snow-plowable pavement marker lenses on various State Routes
 Nightly, 8 p.m. – 5 a.m., Alternating NB & SB lane closures for replacing pavement marker lenses.
One lane will remain open at all times (MM 60 – 65 and MM 52 – 55)
WILLIAMSON COUNTY I-840
The removing & replacing of snow-plowable pavement marker lenses on various State Routes
 Nightly, 8 p.m. – 5 a.m., Alternating NB & SB lane closures for replacing pavement marker lenses.
One lane will remain open at all times (MM 18 – 33)
WILSON COUNTY I-840
The removing & replacing of snow-plowable pavement marker lenses on various State Routes
 Nightly, 8 p.m. – 5 a.m., There will be a lane shift on I-840 E ramp to I-40 E ramp for concrete saw
cutting. Ramp will remain open.
DAVIDSON COUNTY SR 1
Replacement of Broadway Bridge
 Continuous: A permanent traffic switch on SR 1 (Broadway) between 10th Ave S and 12th Ave S for
bridge demolition reduces the bridge down to 2 lanes in each direction and a single pedestrian
path across the bridge.
 Nightly, 8 p.m. – 5 a.m., excluding weekends there will be a double right lane closure on SR-1
(Broadway) EB between 10th Ave S and 12th Ave to begin demolition.
DAVIDSON COUNTY SR 6
The resurfacing on U.S. 31E (S.R. 6) from north of S.R. 45 (Old Hickory Boulevard) (L.M. 18.60) to the
Sumner County line (L.M. 22.87)
 Nightly, 8 p.m. – 5 a.m., There will be a lane closures for expansion joint repair and epoxy overlay
on bridge over CSX.
DAVIDSON COUNTY SR 45
The resurfacing on SR 45 (OHB) from SR 65 (Whites Creek Pike) to U.S. 41 (U.S. 31W, SR 11, Dickerson
Pike)
 Daily, 9 a.m. – 3 p.m., There will be lane closures on Old Hickory Blvd. from Whites Creek Pike to
Dickerson Pike for clipping shoulders, milling and paving and temporary striping.
DAVIDSON COUNTY, SR 112
SR 112 (US 41A/Clarksville Pike) from SR 12 (Ashland City Highway) to SR 155 (Briley Pkwy.) –
Piedmont Move Prior
 Daily, 9 a.m. – 3 p.m., There will be a temporary alternating lane closure on SR 112 Clarksville Pike
in both directions for grade work, paving, installation of storm drainage, sanitary sewer, installation
of water line, underground communications, and overhead power. Courtney Avenue will be closed
and the merging lane to Nashville on Ashland City highway will closed. Kings Lane will be closed.
Flaggers will be utilized.
DAVIDSON COUNTY SR 155

TDOT Region 3 • 6601 Centennial Boulevard • Nashville, Tennessee 37243
Tel: 615-741-7446 • Cell: 615-961-6717 • Email: [email protected]
The retracing of pavement markings with spray thermoplastic on various Interstate and State
Routes
 Nightly, 8 p.m. – 5 a.m., Alternating NB & SB lane closures for replacing pavement marker lenses.
One lane will remain open at all times
DAVIDSON COUNTY SR 255
The grading, drainage, construction of bridges, retaining walls and paving on I-40 (MM 216) at the
Donelson Pike interchange
 Daily, 9 a.m. – 3 p.m., There will be a lane closure on Donelson Pk for utility relocation work.
DAVIDSON COUNTY SR 265
The improvement of the intersection on SR 45 (Old Hickory Blvd) at SR 265 (Central Pike), including
grading, drainage, paving, retaining wall and signals.
 Daily, 9 a.m. – 3 p.m., There will be alternating lane closures on Central Pike at the intersection of
Old Hickory Blvd.; there will be a closure of the southbound turning lane on Old Hickory Blvd, to
westbound Central Pike, for saw cutting, sidewalk, retaining wall and curb & gutter installation.
MARSHALL COUNTY SR 11
The construction of a Bulb-Tee beam bridge on U.S. 31A (S.R. 11, Nashville Highway) over Rock Creek
(L.M. 13.18) in Lewisburg, including grading, drainage and paving.
 Continuous, Restricted Lane width to 12 feet for bridge repair with single lane closure.
MONTGOMERY COUNTY SR 112 / SR 76
Intersection Improvements. Grading, Drainage and Construction of Retaining walls.
 Daily, 9 a.m. – 3 p.m., Temporary Lane closures for utility relocation, grading and drainage
installation.
RUTHERFORD COUNTY SR 99
The grading, drainage, construction of retaining walls, signals and paving on SR-99 (New Salem Hwy)
from near I-24 to SR-96 (Old Fort Pkwy)
 Daily, 9 a.m. – 3 p.m., There will be periodic flagging operations for construction activities.
RUTHERFORD COUNTY SR 266
The grading, drainage, construction of two concrete bulb tee beam bridges, signals, and paving on
SR-266 (Jefferson Pike) from SR-102 (LM 5.0) to E. of I-840 (LM 9).
 Daily, 9 a.m. – 3 p.m., There will be periodic flagging operations for construction activities.
SUMNER COUNTY SR 6
LPLM: City of Gallatin Sidewalks
 Daily, 9 a.m. – 3 p.m., Temporary Lane closures for grading, drainage installation and sidewalk
installation
SUMNER COUNTY SR 386
The on-call concrete pavement repair at various locations on various Interstate and State Routes
 4/30 – 5/3, 10 p.m. – 8 a.m., There will be a partial ramp closure on Vietnam Veterans Pkwy EB to
Exit 2/Exit 3 to replace damaged concrete. One lane will remain open.

TDOT Region 3 • 6601 Centennial Boulevard • Nashville, Tennessee 37243
Tel: 615-741-7446 • Cell: 615-961-6717 • Email: [email protected]
WILLIAMSON COUNTY SR 96
Grading, drainage, construction of bridges and signals on SR 96 from east of Arno Rd (LM 14.72) to SR
252 (Wilson Pk) (LM 20.62).
 Daily, 9 a.m. – 3 p.m., There will be lane closures and brief stoppages of traffic for traffic control
and grading operations.
WILLIAMSON COUNTY SR 106
I-65 Interchange at Buckner Road
 Daily, 9a.m. – 3 p.m., (excl. Sun.), There will be intermittent flagging operation on Lewisburg Pike
(SR 106) from LM 3.7 to LM 4.0 for construction activities.
Scheduled Maintenance Work
Pothole Patching will be conducted daily from 9 a.m. – 3 p.m. on the following roads:
 Davidson Co. SR 100
 Davidson Co. SR 1
 Davidson Co. SR 45
 Davidson Co. SR 171
 Davidson Co. SR 251
 Davidson Co. 254
DAVIDSON COUNTY I-24
Blasting Operations (private development)
 Daily, 2 p.m. – 2:30 p.m., Rolling roadblock EB & WB for 15-minute increments for blasting
operations (MM 53 – 55)
DAVIDSON COUNTY I-24 & I-440
Emergency Tree Removal
 5/3, 9 a.m. – 12 p.m., Lane 2 will be closed on I-440 exit ramp at the I-24 split for emergency tree
removal.
RUTHERFORD COUNTY I-24
Mill and Fill as Needed (pothole patching)
 Daily, 9 a.m. – 3 p.m., Various lane and shoulder closures as needed (MM62 – 89)
RUTHERFORD COUNTY I-24
Milling and Paving on Epps Mill Road Overpass
 5/1 – 5/3, 8 a.m. – 4 p.m., There will be a lane closure on Epps Mill Road for milling an paving
operations on the approaches to the overpass. No work will take place on the interstate, but queue
trucks will be present due to the possibility of back-up onto the interstate.
DAVIDSON COUNTY I-40
Repairing shoulder settlement
 5/3 – 5/4, 8 p.m. – 5 a.m., WB lanes 3 and 4 and shoulder closure (MM 211 – 212)

2 COMMENTS

  1. Wonderful insights! The way you break down the complexities is commendable. For additional information on this topic, I recommend visiting: EXPLORE FURTHER. Keen to hear more opinions from the community!

  2. Thank you for every one of your labor on this site. Debby loves participating in investigation and it is easy to understand why. Most people know all about the compelling form you convey sensible tactics by means of the website and as well as encourage participation from some others about this concern while our child is actually studying a great deal. Have fun with the rest of the new year. You’re carrying out a first class job.

LEAVE A REPLY

Please enter your comment!
Please enter your name here