FOR YOUR CLOSE TO HOME TRAFFIC FIND YOUR LOCATION HERE
DAVIDSON / RUTHERFORD COUNTY I-24
The construction of an Intelligent Transportation System and upgrades from Nashville to Murfreesboro (Phase 2)
Nightly, 8 p.m. – 5 a.m., There will be single right lane closures in both directions to troubleshoot DMS signs.
DAVIDSON COUNTY I-24
On-call sign repair/replace
MM 208, Nightly 8 p.m. – 5 a.m., There will be alternating single/double-right and left lane closure as needed on I-24 EB for the installation of extruded panel signs. Not all one continuous closure each night. (MM 40 – 45)
DAVIDSON COUNTY I-40
The grading, drainage, construction of bridges, retaining walls and paving on I-40 (MM 216) at the Donelson Pike interchange
Daily, 10 a.m. – 2 p.m., There will be rolling roadblocks for blasting operations. Blasts are tentatively scheduled for 2/2, 2/6, and 2/8.
On-call sign repair/replace
2/5 – 2/8, 8 p.m. – 5 a.m.
MM 209 – 206, there will be alternating double/triple-right and left lane closure as needed with Temporary ramp closures at Exit 209B, 209A, & 209 on I-40 WB for the installation of extruded panel signs. Not all one continuous closure each night
MM 210 – 209, there will be alternating double/triple-right and left lane closure as needed on I-40 WB for the installation of an extruded panel sign.
MM 204 – 205, there will be rolling roadblocks on I-40 EB for the installation of extruded panel signs. Not all one continuous closure each night
MM 210, there will be rolling roadblocks on I-40 EB for the installation of extruded panel signs. Not all one continuous closure each night
MM 208, there will be rolling roadblocks on I-40 EB for the installation of extruded panel signs. Not all one continuous closure each night
MM 206, there will be rolling roadblocks on I-40 EB for the installation of extruded panel signs. Not all one continuous closure each night
DICKSON / WILLIAMSON / CHEATHAM / DAVIDSON COUNTIES I-40
The expansion of the SmartWay Intelligent Transportation System (ITS) on I-40 from near I-840 in Dickson County to near U.S. 70S (Exit 196) in Davidson County
Daily, 7:30 a.m. – 6 p.m., There will be temporary daytime shoulder closure in both directions for trenching and boring operations at various locations throughout the project limits.
DAVIDSON COUNTY I-65
On-call sign repair/replace
2/5 – 2/8, 8 p.m. – 5 a.m., There will be a triple-left lane closure on I-65 SB for the instillation of an extruded panel sign. (MM 81)
The on-call concrete pavement repair at various locations on various Interstate and State Routes
2/6 – 2/8, 8 a.m. – 4 p.m., There will be alternating lane shifts on Armory Drive to the I-65 southbound ramp and on the I-65 southbound ramp to Armory Drive to seal concrete. Ramps will remain open.
DAVIDSON COUNTY I-65 / SR 254
The grading, drainage, construction of a retaining wall, signals and paving on I-65 at the NB exit ramp to SR 254 (OHB, Exit 74A)
Daily, 9 a.m. – 3 p.m., There will be temporary lane closures on SR 254 (OHB) in both directions for grading and signal work. Two lanes will remain open in each direction.
RUTHERFORD COUNTY I-840 / I-24
On-call concrete repair
Continuous, the exit ramp from I-840 EB to I-24 EB (Exit 53A) will be narrowed and traffic shifted to repair damaged concrete.
RUTHERFORD COUNTY I-24
The resurfacing of I-24 from E of Epps Mill Road to Beechgrove
Nightly, 8 p.m. – 5 a.m., There will be alternating lane closures re-stripe painted pavement markings.
ROBERTSON COUNTY I-65
Interstate Widening – Grading, drainage, construction of bridges and retaining walls, ITS and paving
Nightly, 8 p.m. – 4 a.m. There will be temporary lane closures on I-65 SB to relocate barrier rail, one lane will remain open at all times. Rolling roadblocks are expected on 2/2 to set beams on bridge over Horseshoe Road.
Daily, 9 a.m. – 3 p.m. There will be temporary lane closures on I-65 NB & SB for emergency pavement repair if necessary.
Nightly, 8 p.m. – 5 a.m., There will be temporary lane closures on I-65 SB at the Horseshoe Road Bridge to set beams. Request to slow roll traffic when setting beams.
RUTHERFORD COUNTY I-840 / I-24
On-call concrete repair
Continuous Traffic Shift: The exit ramp from I-840 EB to I-24 EB (Exit 53A) will be narrowed and traffic shifted to repair damaged concrete.
DAVIDSON COUNTY SR 1
Replacement of Broadway Bridge
2/5, 5 a.m. – 1 p.m. to implement the shift and it will remain in place continuously until summer: There will be a permanent traffic switch on SR 1 (Broadway) between 10th Ave S and 12th Ave S for bridge demolition. This shift will reduce the bridge down to 2 lanes in each direction and a single pedestrian path across the bridge.
DAVIDSON COUNTY, SR 112
SR 112 (US 41A/Clarksville Pike) from SR 12 (Ashland City Highway) to SR 155 (Briley Pkwy.) – Piedmont Move Prior
Daily, 9 a.m. – 3 p.m., There will be a temporary alternating lane closure on SR 112 Clarksville Pike in both directions for grade work, paving, installation of storm drainage, sanitary sewer, installation of water line, underground communications, and overhead power. Courtney Avenue will be closed and the merging lane to Nashville on Ashland City highway will closed. Kings Lane will be closed. Flaggers will be utilized.
DAVIDSON COUNTY SR 265
The improvement of the intersection on SR 45 (Old Hickory Blvd) at SR 265 (Central Pike), including grading, drainage, paving, retaining wall and signals.
Daily, 9 a.m. – 3 p.m., There will be a lane closure on the N side of Central Pike Avenue at the intersection of Central Pike and Old Hickory Blvd. WB for saw cutting, sidewalk, retaining wall and curb & gutter installation.
MONTGOMERY COUNTY SR 13/SR 48/SR 112
Milling and Paving Operations on SR 13 (Wilma Rudolph Blvd) SR 48 (College St.) and SR 112 (North 2nd/University Ave.)
Daily, 9 a.m. – 3 p.m., Temporary Lane closures for utility relocation, grading and drainage installation.
MONTGOMERY COUNTY SR 112 / SR 76
Intersection Improvements. Grading, Drainage and Construction of Retaining walls.
Daily, 9 a.m. – 3 p.m., Temporary Lane closures for utility relocation, grading and drainage installation.
RUTHERFORD COUNTY SR 1
LPLM: Town of Smyrna Street Scapes on SR-1
Daily, 9 a.m. – 3 p.m., There will be alternating lane closures for construction activities.
RUTHERFORD COUNTY SR 99
The grading, drainage, construction of retaining walls, signals and paving on SR-99 (New Salem Hwy) from near I-24 to SR-96 (Old Fort Pkwy)
Daily, 9 a.m. – 3 p.m., There will be periodic flagging operations for construction activities. Industrial Blvd will be closed on Sat 2/4. A signed detour will be in place.
RUTHERFORD COUNTY SR 266
The grading, drainage, construction of two concrete bulb tee beam bridges, signals, and paving on SR-266 (Jefferson Pike) from SR-102 (LM 5.0) to E. of I-840 (LM 9).
Daily, 9 a.m. – 3 p.m., There will be periodic flagging operations for construction activities.
SUMNER COUNTY SR 109
2/2, 8 P.M. – 5 A.M., There will be a single right lane closure on SR 109 for the installation of extruded panel signs.
WILLIAMSON COUNTY SR 6
Grading, drainage and paving work on SR 6 (Franklin Road) from south of Moore’s Lane (LM 15.93) to Concord Road (18.53) – (mm 15.93 – 18.53)
Daily, 9 a.m. – 3 p.m., There will be lane closures in place for final striping.
WILLIAMSON COUNTY SR 96
Grading, drainage, construction of bridges and signals on SR 96 from east of Arno Rd (LM 14.72) to SR 252 (Wilson Pk) (LM 20.62).
Daily, 9 a.m. – 3 p.m., There will be lane closures and brief stoppages of traffic for traffic control and grading operations.
WILLIAMSON COUNTY SR 106
I-65 Interchange at Buckner Road
Daily, 8 p.m. – 5 a.m., excluding weekends, there will be a lane closure on I-65 SB from LM 55.4 to LM 56.0 to move barrier rail.
Scheduled Maintenance Work
Pothole Patching will be conducted daily from 9 a.m. – 3 p.m. on the following roads:
Davidson Co. SR 106
Davidson Co. SR 100
Davidson Co. SR 251
Davidson Co. SR 254
Davidson co. SR 171
GILES COUNTY I-65
Asphalt Overlay – Pothole Patching and prevention
2/6, 9 a.m. – 3 p.m., Exit 6 SB on-ramp and right lane closure. Left lane will remain open.
2/7, 9 a.m. – 3 p.m., Alternating lane closures SB for asphalt overlay on Bridges at the 3.2MM and 2.8MM. One lane will remain open at all times.
DAVIDSON COUNTY I-65
Boring/ drilling on overpasses
Nightly, 9 p.m. – 5 a.m., NB and SB shoulder will be closed for boring (MM 95 – 97)
WILLIAMSON COUNTY I-840
Vegetation Removal
Daily, 9 a.m. – 3 p.m., Shoulder closure in both directions
Motorists are encouraged to use caution and obey reduced speed limits in all TDOT work zones, regardless of lane closure activity. Information in this report is provided to the Department of Transportation by the contractors. Most work is weather dependent and subject to change due to inclement weather.
From your desktop or mobile device, get the latest construction activity and live streaming SmartWay traffic cameras at www.TNSmartWay.com/Traffic. Travelers can also dial 511 from any landline or cellular phone for travel information, or follow us on Twitter at www.twitter.com/TN511 for statewide travel.
As always, drivers are reminded to use all motorist information tools wisely and Know Before You Go! by checking travel conditions before leaving for your destination. Drivers should never tweet, text or talk on a cell phone while behind the wheel.
Thank you for your sharing. I am worried that I lack creative ideas. It is your article that makes me full of hope. Thank you. But, I have a question, can you help me?
Your point of view caught my eye and was very interesting. Thanks. I have a question for you. https://accounts.binance.com/kz/register?ref=RQUR4BEO
I was very pleased to find this web-site.I wanted to thanks for your time for this wonderful read!! I definitely enjoying every little bit of it and I have you bookmarked to check out new stuff you blog post.
Can you be more specific about the content of your article? After reading it, I still have some doubts. Hope you can help me.
You are my intake, I possess few web logs and rarely run out from to brand.
Heya i’m for the primary time here. I found this board and I find It really useful & it helped me out much. I’m hoping to provide something again and aid others such as you aided me.
you’re in point of fact a excellent webmaster. The website loading pace is incredible. It sort of feels that you’re doing any distinctive trick. Also, The contents are masterwork. you have done a wonderful process on this topic!