MIDDLE TENNESSEE SCHEDULED LANE CLOSURES
FOR YOUR CLOSE TO HOME TRAFFIC FIND YOUR LOCATION HERE
March 2 – 8, 2023
To subscribe to the TDOT-REGION-3-LANE-CLOSURES list, send an email to [email protected]
and type subscribe TDOT-REGION-3-LANE-CLOSURES in the message body.
To unsubscribe from the TDOT-REGION-3-LANE-CLOSURES list, send an email to [email protected]
and type unsubscribe TDOT-REGION-3-LANE-CLOSURES in the message body.
DAVIDSON COUNTY I-24
On-call sign repair/replace
MM 40 – 45, Nightly, 8 p.m. – 5 a.m., There will be alternating single/double-right and left lane
closure as needed on I-24 EB for the installation of extruded panel signs. Not all one continuous
closure each night.
MM 51 – 53, Nightly, 8 p.m. – 5 a.m., There will be alternating single/double-right and left lane
closure as needed on I-24 EB for the installation of extruded panel signs. Not all one continuous
closure each night
ROBERTSON COUNTY I-24
Construction and Bridge repair
Continuous, The outside shoulder will be closed in both directions with barrier rail at 4 different
overpassing bridges for bridge repair: SR-49, Jack Teasley Road, Gause Road, SR-256. Both lanes of
travel on I-24 will remain open.
CHEATHAM COUNTY I-40
On-call sign repair/replace
Nightly, 8 p.m. – 5 a.m., There will be a single right lane closure on I-40 EB for the installation of
extruded panel sign. (MM 186 – 187)
DAVIDSON COUNTY I-40
The grading, drainage, construction of bridges, retaining walls and paving on I-40 (MM 216) at the
Donelson Pike interchange
Daily, 10 a.m. – 2 p.m., There will be rolling roadblocks for blasting operations. Blasts are
tentatively scheduled for 3/3, 3/6, and 3/8.
On-call sign repair/replace
Nightly, 8 p.m. – 5 a.m.
MM 210 – 209, There will be alternating double/triple-right and left lane closure as needed on I-40
WB for the installation of a extruded panel sign.
MM 211 – 214, There will be alternating double right and left lane closure as needed on I-40 EB for
TDOT Region 3 • 6601 Centennial Boulevard • Nashville, Tennessee 37243
Tel: 615-741-7446 • Cell: 615-961-6717 • Email: [email protected]
the installation of a extruded panel sign.
MM 210, (excluding weekends) There will be ramp closures on I-40 EB at exit 208A as well as I-65
SB at Exit 84A and I-65 NB at exit 82B for the installation of extruded panel signs in I40 EB. This
closure will also include all ramps merging onto the I-40 EB loop S of the I-65/I-40 split.
DICKSON / WILLIAMSON / CHEATHAM / DAVIDSON COUNTIES I-40
The expansion of the SmartWay Intelligent Transportation System (ITS) on I-40 from near I-840 in
Dickson County to near U.S. 70S (Exit 196) in Davidson County
Daily, 7:30 a.m. – 6 p.m., There will be temporary daytime shoulder closure in both directions for
trenching and boring operations at various locations throughout the project limits.
DAVIDSON COUNTY I-65
On-call sign repair/replace
Nightly, 8 p.m. – 5 a.m., (excluding weekends) There will be a triple-left lane closure on I-65 SB
for the instillation of an extruded panel sign. (MM 81 – 80)
On-call attenuator repair on various Interstate and State Routes
3/1 – 3/4, 10 p.m. – 6 a.m., There will be ramp closures of the Powell Avenue exit ramp to I-65 SB/I-
65NB and the exit ramp from Armory Drive to I-65SB for attenuator installation. (MM 79)
DAVIDSON COUNTY I-65 / SR 254
The grading, drainage, construction of a retaining wall, signals and paving on I-65 at the NB exit
ramp to SR 254 (OHB, Exit 74A)
Daily, 9 a.m. – 3 p.m. & 8 p.m. – 5 a.m., There will be temporary lane closures on SR 254 (OHB) in
both directions for grading and signal work. Two lanes will remain open in each direction.
ROBERTSON COUNTY I-65
Interstate Widening – Grading, drainage, construction of bridges and retaining walls, ITS and paving
Nightly, 8 p.m. – 5 a.m. There will be temporary lane closures on I-65 NB & SB to set beams at
Bridge 6 and 7 over the Red River, one lane will always remain open
Nightly, 8 p.m. – 5 a.m. There will be temporary lane closures on I-65 NB and SB for roadway
maintenance, one lane will always remain open.
Nightly, 8 p.m. – 5 a.m., There will be temporary lane closures on I-65 NB & SB for Bridge 2 demo
beginning on Wed 3/1 and continuing through to 3/8. Both lanes will be shut down. Traffic will run
on the on and off ramps at Exit 112 (SR 25).
RUTHERFORD COUNTY I-840
The installation of interchange lighting and signals at the I-840/Veteran's Parkway interchange and
the widening of the I-840 WB exit ramp to Veterans.
3/5, 1 a.m. – 5 a.m., The entrance ramp from Veteran's Parkway to I-840 EB will be closed in order
to place equipment to pour high mast light pole foundation.
The grading, drainage, construction of two concrete bulb tee beam bridges, signals, and paving on
SR-266 (Jefferson Pike) from SR-102 (LM 5.0) to E. of I-840 (LM 9).
3/4, 7 a.m. – 5 p.m., There will be rolling roadblocks on I-840 in both directions to set beams for
overpass bridge at Jefferson Pike.
DAVIDSON COUNTY SR 1
TDOT Region 3 • 6601 Centennial Boulevard • Nashville, Tennessee 37243
Tel: 615-741-7446 • Cell: 615-961-6717 • Email: [email protected]
Replacement of Broadway Bridge
Continuous: A permanent traffic switch on SR 1 (Broadway) between 10th Ave S and 12th Ave S for
bridge demolition reduces the bridge down to 2 lanes in each direction and a single pedestrian
path across the bridge.
Nightly, 8 p.m. – 5 a.m., excluding weekends, There will be a double right lane closure on SR-1
(Broadway) WB between 10th Ave S and 12th Ave to begin demolition.
DAVIDSON COUNTY, SR 112
SR 112 (US 41A/Clarksville Pike) from SR 12 (Ashland City Highway) to SR 155 (Briley Pkwy.) –
Piedmont Move Prior
Daily, 9 a.m. – 3 p.m., There will be a temporary alternating lane closure on SR 112 Clarksville Pike
in both directions for grade work, paving, installation of storm drainage, sanitary sewer, installation
of water line, underground communications, and overhead power. Courtney Avenue will be closed
and the merging lane to Nashville on Ashland City highway will closed. Kings Lane will be closed.
Flaggers will be utilized.
DAVIDSON COUNTY SR 155
The resurfacing on S.R. 155 (Briley Pkwy) from the McGavock Pike ramp to the bridge over I-65
including S.R. 6 from Ellington Pkwy (L.M.15.49) to Gallatin Pike (L.M. 16.49)
Nightly, 8 p.m. – 5 a.m., There will be temporary ramp closures, in both directions on Briley
Parkway (SR 155) for final striping. Ramps may need to be temporarily closed.
DAVIDSON COUNTY SR 255
The grading, drainage, construction of bridges, retaining walls and paving on I-40 (MM 216) at the
Donelson Pike interchange
Daily, 9 a.m. – 3 p.m., There will be a lane closure on Donelson Pk for utility relocation work.
DAVIDSON COUNTY SR 265
The improvement of the intersection on SR 45 (Old Hickory Blvd) at SR 265 (Central Pike), including
grading, drainage, paving, retaining wall and signals.
Daily, 9 a.m. – 3 p.m., There will be alternating lane closures on Central Pike at the intersection of
Old Hickory Blvd.; there will be a closure of the turning lane on Old Hickory Blvd, south of Central
Pike, for saw cutting, sidewalk, retaining wall and curb & gutter installation.
MAURY COUNTY SR 99
The grading, drainage, construction of retaining walls, signals and paving on SR-99 (New Salem Hwy)
from near I-24 to SR-96 (Old Fort Pkwy)
3/2, 8 p.m. – 5 a.m., There will be a road closure to set bridge beams. All traffic will be detoured
around.
MONTGOMERY COUNTY SR 112 / SR 76
Intersection Improvements. Grading, Drainage and Construction of Retaining walls.
Daily, 9 a.m. – 3 p.m., Temporary Lane closures for utility relocation, grading and drainage
installation.
RUTHERFORD COUNTY SR 1
TDOT Region 3 • 6601 Centennial Boulevard • Nashville, Tennessee 37243
Tel: 615-741-7446 • Cell: 615-961-6717 • Email: [email protected]
LPLM: Town of Smyrna Street Scapes on SR-1
Daily, 9 a.m. – 3 p.m., There will be alternating lane closures for construction activities.
RUTHERFORD COUNTY SR 99
The grading, drainage, construction of retaining walls, signals and paving on SR-99 (New Salem Hwy)
from near I-24 to SR-96 (Old Fort Pkwy)
Daily, 9 a.m. – 3 p.m., There will be periodic flagging operations for construction activities.
Industrial Blvd will be closed on 3/2 – 3/8 for utility line crossing.
RUTHERFORD COUNTY SR 266
The grading, drainage, construction of two concrete bulb tee beam bridges, signals, and paving on
SR-266 (Jefferson Pike) from SR-102 (LM 5.0) to E. of I-840 (LM 9).
Daily, 9 a.m. – 3 p.m., There will be periodic flagging operations for construction activities.
SUMNER COUNTY SR 6
LPLM: City of Gallatin Sidewalks
Daily, 9 a.m. – 3 p.m., Temporary lane closures for grading, drainage installation and sidewalk
installation
WILLIAMSON COUNTY SR 96
Grading, drainage, construction of bridges and signals on SR 96 from east of Arno Rd (LM 14.72) to SR
252 (Wilson Pk) (LM 20.62).
Daily, 9 a.m. – 3 p.m., There will be lane closures and brief stoppages of traffic for traffic control
and grading operations. There may be extended delays the week of March 6th as traffic is swapped
to Phase 2 between Trinity Rd and Wilson Pk.
Scheduled Maintenance Work
Pothole Patching will be conducted daily from 9 a.m. – 3 p.m. on the following roads:
Rutherford Co. I-24:
o 3/6 – 3/2, 9 a.m. – 3 p.m., Alternating lane and shoulder closures will be in place as needed
for milling and repaving.
Davidson Co. SR 1
Davidson Co. SR 24
Davidson Co. SR 100
Davidson co. SR 106
Davidson Co. SR 171
Davidson Co. SR 251
Davidson Co. 254
WILSON COUNTY I-40
Rock Blasting
3/2 – 3/8, 9 a.m. – 3 p.m., Jones Bros. is requesting rolling road blocks E & W bound for a project
between mm 225 & 226. Blasting will be once a day between 1pm & 3pm. Duration of traffic
impacts should be less than 5 minutes per day.
TDOT Region 3 • 6601 Centennial Boulevard • Nashville, Tennessee 37243
Tel: 615-741-7446 • Cell: 615-961-6717 • Email: [email protected]
DAVIDSON COUNTY I-65
Soil Remediation
Daily, 9 a.m. – 3 p.m., Right lane and shoulder closure
Heya this is somewhat of off topic but I was wanting to know if blogs use WYSIWYG editors or if you have to manually code with HTML. I’m starting a blog soon but have no coding knowledge so I wanted to get guidance from someone with experience. Any help would be greatly appreciated!